This is getting ridiculous.

12
Mar
2012

7 active projects. 5 pending projects. 10 project proposals (several of which are bound to be accepted). This is no way to live. It is definitely time to raise rates, or I will go insane. The only thing holding me back has been my fear that the work will dry up, but I can’t go on like this and I suppose I could always lower rates when times are tough to stimulate further demand. And with the exception of one large project, none of these lend themselves to outsourcing at all, they are too small. The time it would take me to explain what I need done would only be marginally less than the time it would take me to do them myself. Is this all the result of the economy getting better? Of word getting out about my skills and work? Dumb luck? Or a mix of everything?